On April 25th, the first LNG tank rail car has been loaded in cooperation of Chart Ferox, VTG, Primagas Germany and Prima LNG. It can carry up to 100 m³ of product and this corresponds to 600.000 kW/h. This loading symbolizes one more step in the transportation of LNG via rail. The event was leaded by representatives from industry, logistics, shipping and the political sphere.